Deprecated: Creation of dynamic property HelloNico\ACF\FieldLoader::$settings is deprecated in /var/www/stage_multisite/releases/20250805075012/wp-content/plugins/acf-country-2.0/acf-country.php on line 33
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf-country domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf-image_crop domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121
Deprecated: Optional parameter $type declared before required parameter $hideCountry is implicitly treated as a required parameter in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/inc/themeFunctions.php on line 1295
Warning: Undefined array key "vicoda" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 11 VICODA Group - Schreiber Brücken-Dehntechnik - New bridge renovation orders - Vicoda : Vicoda
VICODA Group – Schreiber Brücken-Dehntechnik – New bridge renovation orders
2. August 2018
Print
In May, Schreiber Brücken-Dehntechnik GmbH won two new attractive orders in the context of important bridge renovations. These bridges are the 5-span Saale bridge in Bad Neustadt and the 6-span main bridge over the railway lines on the Göppingen-Faurndau motorway, including the ramp connected to this bridge. In both cases, bridge bearings (pot bearings, pot slide and spherical bearings) and noise-reducing expansion joints are being supplied.